The presentation covers the elements of a traditional ICRA plan that involves the regulatory requirements and the following steps:
- Identify risk groups: Determine which patient groups are at risk based on construction activities
- Determine precautions: Decide on the appropriate class of precautions to take
- Establish incident reporting: Create a process for reporting any incidents
- Analyze potential contaminants: Consider every possible source of dust or construction contaminant that could spread through the facility
- Implement controls: Design and put in place measures to reduce health risks
Presented by Robert C. Albrecht
Executive EHS Manager for Signature Safety, LLC for the Midatlantic region